Original diagram of conveyor, row forming and container loading stages

Australian trial automates loading of meat export cartons

Home / News & Updates

An Australian prototype formed rows of export cartons and placed them inside shipping containers.

Original diagram of conveyor, row forming and container loading stages
Original process diagram based on AMPC project 2020-1044; it does not depict the trial machine.

From conveyor to container

The Australian Meat Processor Corporation reported on 29 April 2026 that an automated export-carton loader had completed operational trials. A proof-of-concept system first developed at John Dee was further engineered by Fibre King. The prototype takes meat cartons from a conveyor, aligns them into rows and places those rows inside an export container.

Trial throughput

During testing, the system sustained about seven cartons per minute and ran for up to three hours without manual intervention. AMPC said that this rate remained slightly below loading by two workers. The published project describes a prototype trial and further commercial development, rather than an installed Zhengye product.

Related reading

Sources and further reading

Scroll to Top