Sheep and Goat Slaughter Line Equipment

Zhengye builds sheep and goat slaughter lines from 100 to 3,000 heads per shift, engineered primarily for halal markets. These are high-throughput lines where restraint design, bleeding time and skinning quality decide both compliance and profit.

Typical Sheep Line Process Flow

  1. Lairage and reception — holding pens and race sized for flock behavior
  2. Halal restraint and slaughter — restrainer or cradle positioning the animal correctly for the cut, designed to certifier expectations
  3. Bleeding — bleeding conveyor with length calculated for full exsanguination time at line speed
  4. Head and trotter removal — early removal stations to protect fleece and skin quality
  5. Pre-skinning — balanced pre-skinning stations for brisket, legs and flanks
  6. Skinning — sheep skinning machine with controlled pull, protecting pelt value
  7. Evisceration — evisceration conveyor with red/white offal separation
  8. Synchronized inspection — veterinary inspection matched to line speed
  9. Washing and chilling — carcass washing and transfer to chilling rails

Built for Qurban Season Peaks

In Indonesia, Kazakhstan, Uzbekistan and the wider region, many sheep plants earn their year during Qurban season. We design lines that run at sustained peak throughput without losing bleeding time or skinning quality — the two failure points of overloaded sheep lines — and that staff can operate safely at night shifts and seasonal tempo.

Capacity Configurations

  • 100–500 heads/shift — manual and semi-automatic stations with rail transfer; compact footprint
  • 500–1,500 heads/shift — powered bleeding and dressing conveyors, machine skinning, synchronized inspection
  • 1,500–3,000 heads/shift — fully automatic line with continuous conveyors and multi-station skinning

Sheep and goat differ enough in size and handling that we confirm your animal mix before configuring restraint and skinning stations. Request a sheep line proposal →  ·  Back to solutions →

Scroll to Top