International Client Visits

INTERNATIONAL CLIENT VISITS

The records below show photographs from overseas client visits to Nanjing Zhengye Slaughter Machinery Co., Ltd.

International visitors

Polish clients meet in the reception area during their factory visit 01 / 15 26 October | Polish clients visit the factory View details

26 October | Polish clients visit the factory

On 26 October, Polish clients visited the factory to inspect the rotary ritual slaughter box and signed an agreement of intent to purchase it.

Clients from Ghana with Mr. Chen of Zhengye Slaughter Machinery beside displayed equipment, 21 October 2026 02 / 15 21 October 2026 | Clients from Ghana visit the factory for a tour and discussions View details

21 October 2026 | Clients from Ghana visit the factory for a tour and discussions

On 21 October, clients from Ghana visited Zhengye Slaughter Machinery to tour the workshop, view equipment and hold discussions on site.

During the visit, the clients viewed slaughter machinery in the workshop and posed for a group photograph with Mr. Chen of Zhengye Slaughter Machinery beside the displayed equipment. The two sides also met for face-to-face discussions in the reception area.

Australian clients with Mr. Chen of Zhengye Slaughter Machinery beside workshop equipment, 16 October 2026 03 / 15 16 October 2026 | Australian clients visit the factory for a tour and discussions View details

16 October 2026 | Australian clients visit the factory for a tour and discussions

On 16 October, clients from Australia visited Zhengye Slaughter Machinery for an on-site tour and discussions, viewing slaughter machinery in the workshop.

During the visit, the clients toured the equipment display area and manufacturing workshop, and posed for a group photograph beside the equipment with Mr. Chen of Zhengye Slaughter Machinery.

Visitors and Zhengye staff beside equipment in a workshop 04 / 15 Visiting clients from South Africa View details

Visiting clients from South Africa

Visitors from South Africa pose with Mr. Chen of Zhengye and discuss a slaughter line plan over a laptop.

Cameroon-labelled visitors viewing workshop equipment 05 / 15 Visiting clients from Cameroon View details

Visiting clients from Cameroon

Mr. Chen of Zhengye explains the machinery specifications in detail to visitors from Cameroon beside the equipment.

Zimbabwe-labelled visitor group inside an equipment workshop 06 / 15 Visiting clients from Zimbabwe View details

Visiting clients from Zimbabwe

In the slaughter line workshop, Mr. Chen of Zhengye explains the machinery in detail to visitors from Zimbabwe.

Australia-labelled visitors and Zhengye staff viewing workshop equipment 07 / 15 Visiting clients from Australia View details

Visiting clients from Australia

Mr. Chen of Zhengye explains the slaughter line in detail to visitors from Australia.

Visitors from Russia and Zhengye staff together in the equipment workshop 08 / 15 Workshop group photo with visiting Russian clients View details

Workshop group photo with visiting Russian clients

Mr. Chen of Zhengye accompanies visitors from Russia on a tour of the slaughter equipment production workshop.

Visitors from Russia and Zhengye staff looking at a laptop screen 09 / 15 Office discussion with visiting Russian clients View details

Office discussion with visiting Russian clients

Mr. Chen of Zhengye discusses slaughter machinery installation with visitors from Russia.

Visitors from Russia and Zhengye staff in an indoor group photograph 10 / 15 Indoor meeting with visiting Russian clients View details

Indoor meeting with visiting Russian clients

Mr. Chen of Zhengye poses with visitors from Russia who came to examine a sheep slaughter line.

Mongolia-labelled visitors discussing papers at a table 11 / 15 Visiting clients from Mongolia View details

Visiting clients from Mongolia

Mr. Chen of Zhengye discusses the process for a sheep slaughter line with visitors from Mongolia.

Bangladesh-labelled visitor group in an equipment workshop 12 / 15 Visiting clients from Bangladesh View details

Visiting clients from Bangladesh

Visitors from Bangladesh came to Zhengye's factory to select equipment.

Two-person photograph from the Lagos, Nigeria archive 13 / 15 Visiting clients from Lagos, Nigeria View details

Visiting clients from Lagos, Nigeria

After reaching an agreement on slaughter equipment, a client from Nigeria and Mr. Chen of Zhengye pose for a photograph.

Chicago-labelled visitor group beside workshop equipment 14 / 15 Visiting clients from Chicago, USA View details

Visiting clients from Chicago, USA

Mr. Chen of Zhengye explains the equipment details and specifications to visitors from Chicago.

Argentina-labelled group beside workshop equipment 15 / 15 Visiting clients from Argentina View details

Visiting clients from Argentina

Mr. Chen of Zhengye demonstrates a robotic arm used with slaughter equipment.

Scroll to Top