Straight answers to the questions buyers ask most before ordering a slaughter line from Zhengye. If your question is not here, ask us directly.
About Zhengye
Is Zhengye a manufacturer or a trading company?
Nanjing Zhengye Slaughter Machinery Co., Ltd. is a manufacturer with its own factory on Huaxi South Road, Mingjue Industrial Park, Shiqiu Subdistrict, Lishui District, Nanjing, China. Equipment showrooms are in Chongqing and Ma’anshan. Please arrange a factory or showroom visit with our team.
Can we visit the factory or book a video tour?
You can arrange a visit to the Nanjing manufacturing factory or the equipment showrooms in Chongqing and Ma’anshan. Live video visits can also be discussed. Contact us to confirm the location and appointment.
Why do you only build pig, cattle and sheep lines?
Focus. Livestock slaughter has very different engineering from poultry or fish processing. By limiting ourselves to three species, every engineer on your project works on this kind of line every day — which shows in sizing, layout and commissioning speed.
Capacity and Equipment
What capacity range can you deliver?
The confirmed pig line range is 500–2,000 heads per shift, and the cattle line range is 20–500 heads per shift. Sheep/goat lines handle 100 to 3,000 heads per shift. Equipment and automation are configured for the project requirements.
What is the minimum capacity for a complete slaughter line?
The confirmed ranges are 500–2,000 pigs per shift and 20–500 cattle per shift. Sheep lines start from 100 heads per shift. For other requirements, discuss the suitability of individual machines, workstations or a complete line with our team.
Can I buy single machines instead of a whole line?
Yes. We supply individual machines — stunners, dehairers, hide pullers, saws, conveyors, rail systems — with the same QC and documentation as full lines. We will also check that the machine interfaces correctly with your existing line.
Can you match our local voltage and standards?
Yes. Electrical cabinets are built to your voltage and frequency (e.g. 380V/50Hz, 220V/60Hz, 415V/50Hz), wired and labeled in English, with components chosen so your local electricians can source replacements.
Halal Compliance
Can you build a halal-certified slaughter line?
We design halal cattle and sheep lines to support certification — halal killing boxes, correct restraint and orientation, bleeding time, materials and cleanability, plus documentation for your certifier. The certificate itself is issued by your certification body (MUI/BPJPH, JAKIM, KAZHALAL etc.), not by us.
Ordering, Delivery and Payment
How much does a cattle or sheep slaughter line cost?
There is no single price for a complete line. Cost depends on animal type, capacity, automation level and project scope. Send your project parameters for a matched equipment list and budget range.
How long does delivery take?
Single machines: typically weeks. Complete lines: production plus shipping typically runs a few months depending on capacity and automation level. Your quotation includes a project timeline; the contract fixes milestones for design, manufacturing, factory acceptance testing, shipping, installation and commissioning.
What are the payment terms?
Standard terms are T/T bank transfer with a deposit to start production and balance before shipment. Irrevocable letter of credit is accepted for larger turnkey orders. Incoterms are typically FOB or CIF.
Do you handle shipping and customs documents?
Yes. We arrange sea freight to Southeast Asia or rail to Central Asia, and prepare the full document set: invoice, packing list, bill of lading/waybill, certificate of origin and country-specific certificates, including RCEP origin documents where applicable.
Installation and After-sales
Do you install the equipment in our country?
On-site installation, commissioning and operator training can be arranged within the project contract. Agree site readiness, responsibilities, visit duration and acceptance criteria before the work starts. Technical support after handover follows the contract.
How do we get spare parts later?
We can supply some wear spares. Confirm the parts list, models, quantities, compatibility and delivery arrangements for the equipment and contract. For later requests, send the equipment number and component details.
What warranty do you provide?
Manufacturing-defect warranty and technical support follow the contract. Confirm the coverage, duration, response arrangements and spare-parts responsibilities before ordering.

