Robotic Carcass Splitting | 10-second Demonstration

Video duration: · 9:16 portrait video

Zhengye Slaughter Machinery · Equipment Video

About This Video

A 10-second extract of robotic pig carcass splitting, shown at 2× speed. The approved equipment footage illustrates the robotic arm and its interface with the overhead handling station. It is not a complete operating cycle.

10-second operation extract · 2× speed · Not a complete operating cycle

Scroll to Top