PIG · CATTLE · SHEEP
Complete slaughter lines.
Built around your process.
Zhengye Slaughter Machinery supplies slaughterhouse equipment and complete slaughter lines for pigs, cattle and sheep, plus abattoir equipment, line layouts and project delivery support — configured to your capacity, building and market.
CHOOSE YOUR LIVESTOCK LINE
One starting point.
Three focused processing lines.
Start with the livestock line below. For a project proposal, review the building layout checklist and the slaughterhouse equipment list; use the specialist equipment links for machine selection, or compare the full slaughter line scope before requesting a quotation.

Pig processing
From receiving and stunning through scalding, dehairing, dressing and chilling interfaces.
Explore Pig Lines →
Cattle processing
Restraint, heavy-carcass handling, hide removal, evisceration and rail systems.
Explore Cattle Lines →
Sheep & goat processing
Restraint, bleeding, skinning, inspection and transfer — configured to your animal mix.
Explore Sheep Lines →Sheep & goat equipment selection →
PROJECTS & DELIVERY
See the equipment.
Plan the delivery.
A useful slaughterhouse equipment proposal starts with your animal type, throughput, building and utilities. These conditions shape the process, station spacing and transfer between machines along the slaughter line.
Explore Projects & Delivery →
PROJECT DELIVERY
From your floor plan to line handover.
- 01 · Define
Animal type, capacity, building conditions and project requirements.
- 02 · Design
Process flow, equipment selection, layout and utility interfaces.
- 03 · Build
Manufacturing, pre-assembly, testing and export packing.
- 04 · Start
Installation, commissioning, training and support.

COMPANY & QUALITY
Meet Zhengye.
Understand your project partner.
Review pig, cattle, sheep and goat slaughterhouse equipment from Nanjing Zhengye Slaughter Machinery Co., Ltd., together with showroom photographs and process layouts. Check company information, technical documentation and the inspection scope for your project. Each slaughterhouse equipment package is quoted against the capacity you state, and line sections are pre-assembled and tested in Nanjing before export packing.
About Zhengye →ENGINEERING PLANNING GUIDES
Prepare your slaughter line project.
Start with building inputs, compare the equipment scope, or prepare an existing-line survey. Whether the project extends an existing slaughterhouse equipment set or starts a new slaughter line, the layout drawing fixes station spacing, rail height and utility drops.
Slaughterhouse layout: what to send first
Gather the measured floor plan, clear heights, columns, material routes and available services. Use the submission checklist to identify missing inputs and keep the drawing revision clear.
Prepare your layout brief →Equipment quotations: compare the supply scope
Compare machines, quantities, rail and conveyor interfaces, utility connections and supply responsibilities. Use the blank comparison template to record unknowns for the manufacturer’s engineer.
Compare equipment quotation scope →Line retrofit: record what stays and what changes
Record retained equipment, rail routes, service connections and access for delivery and maintenance. Prepare measured drawings, numbered photos and the change list before agreeing replacements.
Prepare a retrofit survey →INDUSTRY UPDATES
Latest industry news
Research, equipment and livestock market updates.
All News & Updates →
Phage study reports less diarrhea in ETEC-challenged piglets
Researchers compared bacteriophage-treated piglets with an ETEC K88 challenge group.
Read update →
Canadian study tracks calf respiratory viruses from birth to weaning
The study followed ten healthy Angus–Hereford beef calves from birth to weaning.
Read update →
Ethiopian sheep ked survey finds 48 infestations among 414 animals
Researchers examined sheep and surveyed farmers in South Gondar, Ethiopia.
Read update →
Blue-light carcass scanner assessed at five Australian plants
AMPC and JBS Australia assessed a handheld scanner as an extra carcass quality check.
Read update →
EU week-43 beef carcass prices show mixed movement
European Commission figures for 19–25 October compare three bovine carcass categories.
Read update →
Sow mulberry-feed trial reports heavier litters at weaning
Researchers compared four diets from late gestation to weaning in 32 French Large White sows.
Read update →
