Zhengye Factory, Production Capacity and Workshop

Zhengye Slaughter Machinery manufactures equipment at its own factory on Huaxi South Road in Nanjing. Equipment showrooms are in Chongqing and Ma’anshan. The photographs and video below show the Chongqing equipment showroom; manufacturing and project test records are reviewed separately.

Manufacturing Topics to Review

The sections below outline manufacturing topics to review for a slaughter line, from fabrication through assembly:

  1. Cutting and forming — stainless and carbon steel plate is cut, bent and formed to drawing. Material batches are logged so every plate in a food-contact zone is traceable.
  2. Welding and fabrication — frames, tanks, rails and conveyor structures are manufactured to the agreed drawings. Welding, surface-finish checks and any required personnel-qualification documents are reviewed against the project contract.
  3. Machining — shafts, rollers and drive components are machined to tolerance so chains, drums and conveyors run true over years of daily washdown.
  4. Assembly — machines are assembled in dedicated bays, with motors, gearboxes, pneumatics and hydraulics fitted and aligned.
  5. Electrical panel building — control cabinets are wired in-house, labeled in English, and configured for the destination country’s voltage and frequency.
  6. Pre-assembly and testing — line sections are pre-assembled in the factory to verify fit and alignment, then tested under power before packing.

Why Pre-Assembly Matters

Key line sections are pre-assembled before shipment to check conveyor heights, rail spacing, drive alignment and equipment interfaces. Identifying fit and connection issues at this stage supports coordinated installation at the project site.

Capacity and Stock

We can supply some wear spares. Models, quantities, compatibility and delivery dates follow the equipment and contract. Confirm the equipment delivery milestones and spare-parts scope before shipment.

Every order is tracked through production with photo and video updates at agreed checkpoints, so you can follow your line being built without boarding a plane. Customers are equally welcome to visit the factory in person — see how we handle factory visits and project delivery.

Quality Before Packing

Every machine is tested individually before shipment. Confirm the test items, acceptance criteria and supplied records for the selected equipment and contract. Review quality and inspection information when agreeing the inspection plan.

Planning a visit or a live video audit? Contact us and we will arrange a walk through the workshops and a look at lines currently in assembly.

Equipment Display Area

Photographs from the Chongqing equipment showroom. These are display views, separate from manufacturing and acceptance-test records.

Equipment display walkthrough

Silent equipment display walkthrough in the Chongqing showroom.

Discuss Your Line Configuration →
Scroll to Top