About Zhengye

ABOUT ZHENGYE

Equipment and line planning.
For pigs, cattle and sheep.

Nanjing Zhengye Slaughter Machinery Co., Ltd. works with slaughter equipment, process layouts and project delivery requirements for pig, cattle, sheep and goat operations. Its Chinese legal company name is 南京正业屠宰机械有限公司, and its brand is 正业屠宰机械 / Zhengye Slaughter Machinery.

Equipment is manufactured at our own factory on Huaxi South Road in Nanjing. Equipment showrooms are in Chongqing and Ma’anshan. Line planning, installation and maintenance support follow the agreed project scope.

Discuss Your Project →
Panoramic exterior view of the Zhengye slaughter machinery factory

THREE LIVESTOCK LINES

A focused equipment business.

Each animal type has different handling, dressing and transport requirements. The selected equipment follows the process and the project conditions.

Three-dimensional slaughter line layout illustration
3D layout illustration

PROCESS & ENGINEERING

Start with the process.
Connect the whole line.

Animal type, operating schedule, building dimensions and utility conditions shape the layout. Equipment selection is reviewed alongside transfer points, working access, hygiene separation and chilling interfaces.

Explore Layout Planning →

PROJECT DELIVERY

Define the work at each stage.

  1. 01 · Plan

    Review process requirements, drawings and equipment scope.

  2. 02 · Build

    Agree manufacturing interfaces and project inspection requirements.

  3. 03 · Deliver

    Coordinate packing, shipment and installation readiness.

  4. 04 · Support

    Discuss commissioning, training, parts and maintenance arrangements.

Project References & Delivery →

COMPANY & QUALITY

Review the information behind your proposal.

Company information, equipment descriptions, process drawings and the agreed inspection documents support project review. Specific qualifications, standards and documents should be confirmed for the selected equipment and destination.

Before approving a slaughterhouse equipment proposal, compare the company named in the offer with the company documents and confirm the manufacturing or showroom location for any visit. Keep company records, display photographs and order-specific inspection records separate.

For your selected equipment, request the dated equipment schedule, drawing revision, agreed inspection records and delivery responsibilities. Review the turnkey project scope and boundaries alongside these documents, and identify any items that remain to be confirmed for your order.

COMPANY PATENT RECORDS

Patents for cattle processing equipment.

The certificates name Nanjing Zhengye Slaughter Machinery Co., Ltd. as the patent holder and cover cattle conveying, hide pulling, hoisting, head washing, rail switching and band-type carcass splitting.

Review one invention patent and five utility model patent certificates, including their patent numbers and grant publication dates.

View Company Patent Certificates →
Lifting rotary drum hide-pulling machine and method of use — invention patent certificate

Explore Zhengye

Equipment Display Area

Photographs from the Chongqing equipment showroom. These are display views, separate from manufacturing and acceptance-test records.

Scroll to Top