Request a Capacity-based Slaughter Line Quote

Send Your Project Enquiry

Complete the form below. Required fields are marked. We use these details to respond to your enquiry. You can email floor plans to [email protected] after submitting.

Zhengye Project Enquiry

Every slaughter line we build is configured to order, so a useful quote starts with your project parameters — not a generic price list. Use the checklist below and send what you know; you can leave undecided details out. We reply with a matched equipment list, a layout suggestion and a realistic budget range.

Start Your Project Inquiry

Send your animal type, target capacity and country. Email is best for drawings and equipment lists.

Your Project Parameters

  1. Animal type — pig, cattle, sheep/goat, or a combination of lines
  2. Capacity — heads per shift and number of shifts per day (e.g. 100 pigs/shift, 1 shift)
  3. Automation level — manual, semi-automatic or fully automatic
  4. Building — new construction or existing building, with length × width × height if available
  5. Utilities — local voltage/frequency (e.g. 380V 50Hz, 220V 60Hz), water and steam availability
  6. Halal requirement — yes/no, and which certification body (MUI/BPJPH, JAKIM, KAZHALAL, other)
  7. Country and city — where the plant will operate
  8. Budget and timeline — your target investment range and when you need the line running

What You Get Back

  • A process flow and equipment list matched to your capacity
  • A preliminary layout suggestion for your building
  • A budget range and delivery timeline
  • Honest advice where a smaller or phased configuration would serve you better

The list above is exactly what our engineers need for a first proposal. For both email addresses and our phone number, see the contact page.

We do not publish fixed price lists because line pricing depends on capacity, automation level and configuration. Any supplier quoting a slaughter line without asking these questions first is guessing.

Scroll to Top