Original process diagram of camera-guided robotic cuts on a beef side

Beef-side robot trials complete chine and square-cut tasks

Home / News & Updates

Researchers tested two robot-guided cuts on stationary beef sides at a dedicated trial area.

Original process diagram of camera-guided robotic cuts on a beef side
Original diagram from AMPC project information; it is not a photograph or drawing of the trial equipment.

Two cuts tested at Kilcoy

The Australian Meat Processor Corporation reported a robot trial at Kilcoy Global Foods in September 2026. Project 2025-1111 addressed two beef-side operations: removing the chine bone from the chuck and cube-roll area, and extending cuts to make a square-cut cube roll. The team installed a robot, cameras, beef-side supports and prototype cutting tools in a dedicated chilled trial area. Both tasks were tested on stationary sides.

From camera path to boning room

The team adjusted the cutting paths to the size and shape of each side and demonstrated both operations to AMPC and Kilcoy staff. A higher-volume chine-removal trial compared yield with control sides and checked that downstream boning could process the resulting cuts. The public report calls for further production-scale development to test cycle time, reliability, cleaning and tool life; it does not describe a commercial machine already operating across a full line.

Related reading

Sources and further reading

Scroll to Top