A slaughterhouse proposal needs to coordinate animal type, target throughput, process route, building conditions, utilities, inspection requirements and installation arrangements. Zhengye plans the equipment list and layout around the project requirements. Design documents, equipment configuration and the service scope follow the agreed proposal and contract.
How a Zhengye Turnkey Project Works
- Capacity and process design — we start from your animal mix, heads per shift and shift pattern, and design the process flow that meets it without bottlenecks or idle stations.
- Layout engineering — line layout adapted to your building (or a building design if you are starting from land), covering hygiene zoning, personnel flow, utilities and cold chain connection.
- Compliance planning — process and equipment documentation supplied within the agreed contract scope, with veterinary inspection positions and hygienic layout reviewed for the target market. Halal certification is assessed and issued by the competent authority or recognized certification body.
- Manufacturing and individual testing — each machine undergoes individual testing. Customer attendance or video acceptance arrangements follow the project contract.
- Delivery and installation — export packing, shipping, on-site erection, commissioning and operator training.
- Wear spare parts and support — selected wear spare parts are provided. Confirm the list, quantities and subsequent support scope for the project.
Turnkey slaughterhouse solution in detail →
Solutions by Livestock Line
Pig Slaughter Line Solution
The confirmed pig line configuration is 500–2,000 heads per shift. Plan scalding, dehairing, dressing and transfer equipment around the project requirements, and confirm the scope of chilling and cutting interfaces in the proposal. Explore the pig line →
Cattle Slaughter Line Solution
The confirmed cattle line configuration is 20–500 heads per shift, planned for a conventional or halal route. A ritual rotary slaughter box is used only for the halal route and is not mandatory for a conventional route. Hide pulling, evisceration, splitting and transfer follow the project requirements. Explore the cattle line →
Sheep and Goat Slaughter Line Solution
High-throughput halal sheep and goat lines from 100 to 3,000 heads per shift, engineered for Qurban season peaks as well as daily operation. Explore the sheep line →
Solutions by Project Scale
- Small-scale plants — budget-conscious, semi-automatic configurations that meet hygiene zoning rules and leave a clear expansion path
- Medium-capacity plants — balanced automation selected for the project, with interfaces for chilling and the cold chain
- Large industrial plants — high-automation lines with synchronized conveyors, byproduct handling and full food safety systems
Start With Your Parameters
Send us your animal type, capacity, country and building situation. We will respond with a process flow, equipment list, layout suggestion and budget range. Request a capacity-based proposal →
Explore your project requirements
From Layout to Equipment Configuration
3D illustrations of equipment and rail arrangements. Your proposal follows your building and utilities; these illustrations do not state a confirmed project capacity.




