Nanjing Zhengye Slaughter Machinery Co., Ltd. (南京正业屠宰机械有限公司) is a Chinese manufacturer of pig, cattle and sheep slaughter equipment, based in Nanjing, Jiangsu Province. We design, build, install and commission complete slaughter lines for customers in Southeast Asia, Central Asia and beyond — with halal compliance support as a core part of our engineering, not an afterthought.
Focused on Three Livestock Lines Only
Many equipment suppliers will sell you anything from a bakery oven to a fish processor. We made a different choice: Zhengye builds slaughter lines for pigs, cattle and sheep — and nothing else. That focus shows up in the details that decide whether a line runs well: how a stunner is sized for local pig breeds, how a halal killing box rotates for a smooth cut, how a sheep skinning line keeps pace with a 3,000-head shift.
Because our engineers work on the same three species every day, we have seen most of the problems a slaughterhouse project can hit — mismatched conveyor speeds, undersized bleeding rails, utilities that fall short at peak load — and we design them out before manufacturing starts.
What We Do
- Slaughter line engineering — process design, capacity planning and layout drawings for new plants and upgrades
- Equipment manufacturing — stunning, bleeding, dehairing, skinning, evisceration, inspection, chilling and rail systems, built in our own workshops
- Turnkey delivery — export packing, shipping, on-site installation, commissioning and operator training
- Halal compliance support — equipment and layout designed to support MUI/BPJPH, JAKIM, KAZHALAL and other certification processes
- After-sales service — spare parts, remote guidance and maintenance planning for the life of the line
Built for Export
Zhengye is an export-oriented manufacturer. Our projects ship by sea and rail to Indonesia, Vietnam, the Philippines, Thailand, Malaysia, Kazakhstan, Uzbekistan and neighboring markets. We handle export documentation, container loading plans and the practical details that decide whether a project clears customs smoothly and erects without surprises.
Learn more about our factory and production capacity, how we control quality, and how we deliver export projects.
Work With Us
If you are planning a new slaughterhouse, expanding capacity, or replacing an aging line, tell us your animal type, target capacity and country. We will respond with a technical proposal — not a sales brochure.