Projects & Delivery

PIG · CATTLE · SHEEP / PROJECT DELIVERY

Explore footage of project installation and commissioning, equipment arrangements and layout references, then discuss the delivery scope for your slaughterhouse. Animal types, processes, building conditions and equipment interfaces shape each project.

PROJECT FOOTAGE

Installation and commissioning on site

View videos from equipment installation, line commissioning and completed project work. Select a thumbnail to watch the full video in a popup.

Equipment and overhead rails at the cattle line commissioning site in Chongqing 4:27

Cattle line · 40 head/hour

Cattle line commissioning in Chongqing

Commissioning footage of a cattle slaughter line with a capacity of 40 head per hour. View the equipment, overhead rails and workstation connections before production.

Select the thumbnail to play the full video →
Cattle line equipment during installation in Jiangjin, Chongqing 1:45

Cattle line · 300 head/shift

Cattle line installation in Jiangjin, Chongqing

Video of equipment installation for a cattle line project with a capacity of 300 head per shift. The footage shows the site layout and equipment connections during installation.

Select the thumbnail to play the full video →
Equipment, rails and platforms on the completed sow skinning line 1:03

Sow skinning line · Work completed

Completed sow skinning line

Footage of the completed sow skinning line, showing the arrangement of skinning equipment, conveyor rails and operator platforms.

Select the thumbnail to play the full video →
Equipment at the Sichuan project after installation 1:01

Project installation · Production preparation

Completed equipment installation in Sichuan

Site footage from the Sichuan project after equipment installation, during preparation for production. The video shows the equipment at the completed installation stage.

Select the thumbnail to play the full video →
Cattle line equipment at the commissioning site in Kyrgyzstan 2:28

Cattle line · Commissioning

Cattle line commissioning in Kyrgyzstan

The cattle slaughter line in Kyrgyzstan has entered commissioning. View the equipment arrangement and connections between sections of the line.

Select the thumbnail to play the full video →
Equipment and conveyor rails at the donkey line project in Kyrgyzstan 1:32

Donkey line · Installation and commissioning

Donkey line installation and commissioning in Kyrgyzstan

Installation and commissioning footage of a donkey slaughter line in Kyrgyzstan, showing equipment and conveyor rails at the project site.

Select the thumbnail to play the full video →

LAYOUT REFERENCE

Connect the equipment to your building

A line layout brings together the process route, overhead transport, working platforms, inspection access and chilling interfaces. Share a measured floor plan so these relationships can be reviewed for your site.

Confirm the selected equipment, dimensions, utility requirements and supplied scope during engineering review.

Explore Layout Planning →
3D design illustration of a processing line layout with overhead transport and workstations
3D design illustration; dimensions and equipment configuration require project review.

THREE LIVESTOCK LINES

Start with your animal and process

Pig processing

Review handling, scalding, dehairing, dressing, inspection and carcass transport, with the working route matched to your building.

Explore Pig Lines →

Cattle processing

Discuss restraint, lifting, hide removal, dressing platforms and overhead rail interfaces for the intended cattle process.

Explore Cattle Lines →

Sheep & goat processing

Review handling, bleeding, skinning, inspection and rail transfer for your sheep or goat operation.

Explore Sheep & Goat Lines →

DELIVERY SCOPE

Define each step from layout to handover

The equipment schedule, site responsibilities, documentation and acceptance arrangements are agreed for each project. Use these four stages to prepare the discussion.

  1. 01 · Brief & layout

    Confirm animals, intended output, operating hours and site conditions. Review the process route, equipment selection, building dimensions and utility connections.

  2. 02 · Manufacturing & checks

    Agree drawings, equipment scope and inspection points. Define the records and demonstrations required before equipment release.

  3. 03 · Packing & dispatch

    Coordinate packing, equipment identification, shipping documents, the transport route and responsibilities for unloading at the destination.

  4. 04 · Installation & handover

    Review site readiness, fixing points and services. Agree installation, commissioning checks, operator training, handover records and ongoing support.

Explore Turnkey Delivery →  ·  Installation & Support →

Review the scope for your project

Tell us your animal type, country, target output and operating hours. Include building dimensions, available utilities and a floor plan when you have them.

Send a Project Enquiry →

Contact the Zhengye team

Scroll to Top