ZHENGYE / PROJECT RESOURCES
An equipment price is meaningful only when its scope is clear. Send a project brief so the team can identify the intended machines, interfaces and delivery responsibilities. No standard public price covers every pig, cattle or sheep line.

Define the equipment boundary
List the required process stages and identify existing machines that will remain. Separate main equipment, conveyors, platforms, controls and ancillary items. Clarify whether rail supports, installation materials and utility systems are included or supplied locally.
State capacity in operating terms
Give the required output together with operating hours, shift pattern, animal type and weight range. Explain whether the project is a new installation or an upgrade. Machine selection must account for the full process route and available working space, not only a daily head count.
Compare like-for-like proposals
Compare the equipment list, stated exclusions, materials, drive and control scope, delivery terms, installation arrangements and acceptance criteria. Freight, duties, civil works and refrigeration may sit outside an equipment quotation. Keep these items visible in the project budget.
Slaughterhouse Project Cost for Pig, Cattle and Sheep Lines →
Prepare information for a quotation
Send the country, building drawing, animal process, target schedule, utility information and desired delivery window. If an input is unknown, identify it rather than guess. The first proposal can state the assumptions that require confirmation before a final equipment schedule and commercial offer.
Discuss your project with Zhengye
Send your animal type, country, operating schedule and building information.
Send a project enquiry →Item-by-item quotation comparison
Use this table for project discussions or a printed review. Record actual project information; equipment values and work scope follow the applicable drawings, manuals and contract.
| Review item | Evidence and information to record |
|---|---|
| Equipment list | Compare names, quantities, station scope and component specifications |
| Interfaces and accessories | List rails, platforms, controls, utilities and chilling interfaces |
| Delivery and services | Confirm transport, installation, commissioning, training and documentation separately |
| Exclusions and differences | Record excluded items and assumptions used in each offer |
