Installation and support start with an agreed scope. Define the equipment supplied, site responsibilities, commissioning checks and training needs before shipment so the installation team has the right information.

Confirm site readiness
Review access for unloading, foundations and fixing points, structural support for overhead rails, finished floor levels and drainage. Identify power, water, compressed air and other utility connections that the selected machines require. The building and utilities must be checked against the agreed drawings before equipment installation.
Coordinate installation responsibilities
Agree who provides lifting equipment, local labour, qualified electrical personnel and site supervision. Identify interfaces with refrigeration, civil works and wastewater systems. Confirm travel arrangements and the installation schedule only after site readiness and the commercial scope are clear.
Plan commissioning and handover
Prepare a check sheet covering installation completeness, guarding, emergency controls, machine direction, rail movement and process interfaces. Record observations, outstanding items and the agreed acceptance criteria. A showroom display or animation is not a substitute for project-specific commissioning records.
Operator training and ongoing support
Training should address operating sequences, cleaning access, inspection points and routine maintenance using the delivered equipment instructions. Keep equipment records, spare part references and the support contact accessible to the maintenance team. Response arrangements and warranties follow the agreed contract.
Review installation and handover
Provide the project or order reference, drawing revision, site readiness and responsible contact to review the next steps within the agreed scope.
Contact installation support →Site handover checklist before installation
Use this table for project discussions or a printed review. Record actual project information; equipment values and work scope follow the applicable drawings, manuals and contract.
| Review item | Evidence and information to record |
|---|---|
| Drawings and contacts | Confirm drawing revision, equipment list, site lead and communication channel |
| Unloading and foundations | Check access, lifting arrangements, foundations, fixing points and rail supports |
| Utility interfaces | Check electricity, water, air and drainage against project drawings |
| Work boundaries | Agree responsibility for local works, installation, commissioning, training and acceptance |