Slaughter Line Videos and Equipment Demonstrations

Zhengye Slaughter Machinery / Equipment Footage

Watch 14 filmed videos of pig, cattle and offal processing equipment, from individual machine commissioning to line operation. Browse by equipment category and select a thumbnail to watch in a popup.

Pig Slaughter Equipment

See operating and commissioning footage of stunning, tilting, skinning and dehairing equipment.

Filmed view of pig three-point electrical stunning equipment and its conveyor section 1:00

Pig Equipment · Electrical Stunning and Conveying

Three-Point Pig Electrical Stunner: Commissioning

Three-point electrical stunning equipment serves the stunning stage at the front of a pig slaughter line and is arranged with the conveyor section. The video shows commissioning, connections at the inlet and outlet, and associated control components.

Select a thumbnail to watch the full video →
Sow skinning station and associated equipment 1:34

Pig Equipment · Skinning

Sow Skinning in Operation

Footage from a sow skinning station shows how the skinning equipment and manual work are coordinated. The video shows the connections between the skinning station, overhead carcass transport and the operator area.

Select a thumbnail to watch the full video →
Pig tilting box body and supporting structures 0:50

Pig Equipment · Front of the Line

Pig Tilting Box: Construction

Filmed footage shows the pig tilting box body, supports and associated mechanisms. The overall structure provides a basis for discussing operator positions and connections to hoisting and transfer equipment.

Select a thumbnail to watch the full video →
Standalone spiral dehairing machine with its inlet and outlet 3:52

Pig Equipment · Dehairing

Standalone Spiral Dehairing Machine

The standalone spiral dehairing machine serves the dehairing stage of a pig slaughter line. The video shows the machine body, inlet and outlet, and work on site, illustrating connections to the preceding and following conveyor sections.

Select a thumbnail to watch the full video →

Cattle Slaughter Equipment

View restraint, rotary slaughter, hide removal and rail transfer equipment, with views of the connections between workstations.

Cattle hide puller with inclined columns and associated structures 1:00

Cattle Equipment · Mechanical Hide Removal

Cattle Hide Puller with Inclined Columns

The cattle hide puller with inclined columns serves the mechanical hide removal stage of a cattle slaughter line. The video shows the columns, drive and hide pulling mechanism, providing a basis for discussing its installation position and surrounding working space.

Select a thumbnail to watch the full video →
Cattle rail transfer device and overhead rail connections 1:03

Cattle Equipment · Rail Transfers

Cattle Overhead Rail Transfer Device

The cattle rail transfer device works with the overhead conveyor system to connect different rail sections. The video shows its transfer mechanism, hanging fittings and connections to support discussions of routing and installation space.

Select a thumbnail to watch the full video →
Cattle tilting box body and associated structures 2:07

Cattle Equipment · Front of the Line

Cattle Tilting Box: Construction

Filmed footage shows the cattle tilting box body, panels and associated mechanisms. The structure and operator side layout provide a basis for discussing connections to adjacent equipment and personnel access.

Select a thumbnail to watch the full video →
Religious slaughter box body and rotating structure 1:14

Cattle Equipment · Religious Slaughter Configuration

Rotary Box for Religious Slaughter

Filmed footage shows the rotary slaughter box body, rotating structure and associated components. Its layout needs to follow the slaughter method selected for the project and coordinate the restraint station, personnel access and subsequent hoisting connections.

Select a thumbnail to watch the full video →

Offal Conveying and Washing Equipment

View offal conveyors and tripe and omasum washing equipment, and the connections between carcass dressing and offal processing areas.

Beef tripe and omasum washing equipment 1:00

Offal Processing · Washing Equipment

Beef Tripe and Omasum Washing Equipment

Beef tripe and omasum washing equipment serves the offal processing area. The video shows the drum, internal structure and control components, with views of loading and discharge positions and the surrounding operating space.

Select a thumbnail to watch the full video →
Offal conveyor surfaces and drive components for pig, cattle and sheep projects 0:57

Offal Processing · Receiving and Conveying

Offal Conveyors for Pig, Cattle and Sheep Lines

Offal conveyors connect receiving, transfer and subsequent processing stations. The video shows conveyor surfaces, turning sections and drive components; the route is configured to suit the process and layout of each pig, cattle or sheep project.

Select a thumbnail to watch the full video →
Red and white offal conveyor surfaces and associated structures 0:43

Offal Processing · Conveying and Inspection Connections

Red and White Offal Conveying Equipment

Red and white offal conveying equipment works alongside the carcass dressing line, connecting offal receiving, transport and corresponding inspection stations. The video shows conveyor surfaces and installed structures; individual branches and connections are planned to suit the project's process.

Select a thumbnail to watch the full video →

Slaughter Line Footage

See equipment layouts, overhead transport and the space between workstations in footage from the line.

Conveyor rails and tanks on a slaughter line in Guilin 1:00

Line Footage · Guilin, Guangxi

Guilin, Guangxi | Slaughter Line Equipment on Site

Filmed footage shows conveyor rails, tanks and operating areas at the Guilin site. Follow the equipment layout to see access aisles, transfer connections and the space between processing areas.

Select a thumbnail to watch the full video →
Rails and working platforms on the Guilin pig slaughter line 1:00

Line Footage · Pig Slaughter

Guilin, Guangxi | Pig Slaughter Line Footage

Filmed footage shows the equipment layout and surroundings of the Guilin pig slaughter line. Overhead rails, working platforms and associated control cabinets show how the workstations are arranged.

Select a thumbnail to watch the full video →
Pig carcass conveying and hoisting stations at the Laibin site 1:00

Line Footage · Conveying and Hoisting

Laibin | Slaughter Line in Operation

Filmed footage shows pig carcass conveying, hanging and hoisting stations in operation. It shows the connections between transfer tables, overhead rails and operator positions to support discussions of equipment at the front of the line.

Select a thumbnail to watch the full video →

Choose Equipment for Your Line

Tell us the animal type, target capacity and process requirements, and send your building floor plan. We can then discuss equipment selection, workstation layouts and conveyor connections.

Request an Equipment Proposal →
Scroll to Top