A sow and piglets in a USDA Agricultural Research Service archive photograph

Phage study reports less diarrhea in ETEC-challenged piglets

Home / News & Updates

Researchers compared bacteriophage-treated piglets with an ETEC K88 challenge group.

A sow and piglets in a USDA Agricultural Research Service archive photograph
Archive photo: Keith Weller, USDA ARS. These pigs were not in the reported trial.

Researchers examined piglets after an ETEC K88 challenge

BMC Microbiology published the Jiangxi Agricultural University study on 28 October 2026. The researchers tested bacteriophages in weaned piglets challenged with enterotoxigenic Escherichia coli K88. They compared the treated animals with an ETEC K88 challenge group and analysed fecal microbes and metabolites alongside proteins from the jejunum.

The treated group had a lower diarrhea rate

The paper reports a lower diarrhea rate in the bacteriophage group than in the ETEC K88 group. Fecal analysis found higher abundances of Phascolarctobacterium and Faecalibacterium and a lower abundance of Clostridium sensu stricto 6. Metabolite and protein analyses identified changes in bile-related and intestinal immune pathways. The published findings concern the piglets and conditions tested.

Related reading

Sources and further reading

Scroll to Top