COMPANY & QUALITY
Company information and project documentation.
Review the company, equipment scope and quality requirements before ordering. The document package follows the selected equipment, destination and agreed project terms.
Company documents
Nanjing Zhengye Slaughter Machinery Co., Ltd. supplies equipment and line planning information for pigs, cattle, sheep and goats. Contact our team to discuss the company and qualification documents required for your procurement review.
Qualification requirements and certification scope must be checked against the actual document, issuing body and validity period.
Company Profile →COMPANY PATENT RECORDS
Technical development in cattle processing equipment.
Six certificates cover cattle conveying, hide pulling, hoisting, head washing, rail switching and band-type carcass splitting: one invention patent and five utility model patents.
Patent holder named in these certificates: Nanjing Zhengye Slaughter Machinery Co., Ltd.
Utility model patent
Live cattle conveying device for slaughter and bleeding
- Patent number
- ZL 2025 2 1714395.1
- Grant publication date
Invention patent
Lifting rotary drum hide-pulling machine and method of use
- Patent number
- ZL 2025 1 1379534.4
- Grant publication date
Utility model patent
Hoisting device for cattle slaughter
- Patent number
- ZL 2025 2 1791203.7
- Grant publication date
Utility model patent
Cattle head washing device for cattle slaughter
- Patent number
- ZL 2025 2 1954113.5
- Grant publication date
Utility model patent
Cattle rail-switching device
- Patent number
- ZL 2025 2 1791162.1
- Grant publication date
Utility model patent
Band-type carcass splitting saw for cattle slaughter
- Patent number
- ZL 2025 2 1954034.4
- Grant publication date
Certificate records; current legal status is subject to the patent register.
Equipment and layout review
Use equipment descriptions, process layouts and agreed interface drawings to confirm the scope. Review material requirements, welding and surface finish, access for cleaning, rail interfaces, controls and utility connections as relevant to the project.
Process Guides & Charts →Inspection and delivery records
Every machine is tested individually before shipment. Test items, acceptance criteria and supplied records follow the equipment and contract; agree the inspection plan and document list before manufacturing.
Material certificates, third-party inspections and acceptance records should be specified where required; their availability and scope are confirmed for the order.
Project Delivery Planning →Destination requirements
Local regulations, required technical standards and any halal process review should be discussed at the proposal stage. Certification and approval decisions depend on the applicable authority and the project requirements.

